All the exterior
walls of the building should be shown, including
the walls of open courts, and all visible materials called
up.
Indicate the approximate existing grade line on each
elevation.
These drawings should be reexamined for accuracy a£
&nfonaatfon
after the roof finish and door schedules have been
completed, 'Lt is not advisable to show the pictorial elevation of the walls
beyond the section plane.
Indicate the approximate existing grade along the line where
the
section is taken,
Indicate the finish grade elevation and tkte grade finash
adjacent to
the building (paving, grass, etc.)
Indicate the elevation of all the floors, the roof slabs,
the tops
of the foundation, the roof ridge and the slope. Ensure that
adequate vertical dimensioning is provided for the floorto-floor height, all
openings, the depth of footZrtgs belm grade, etc.
Check the insulation of the foundation walls, the slabs at
grade,
the waf ls, the roof, etc. , for location, insulatiun
values, material
and fastening. Indicate the damp-proofing of structures
below grade.
Check the indication of subgrade drains.
Show the parts of the structure behind the cutting plane in
elevation